CHIRA-SORIA PUMPED-STORAGE HYDROELECTRIC POWER PLANT

The Chira-Soria Pumped-Storage Hydroelectric Power Plant Project consists of an underground pumped-storage hydroelectric facility connecting two existing reservoirs located in central Gran Canaria. The main works include: – Construction of intake and outlet structures for the hydraulic circuit. – Excavation, ground support, and lining of the 2 km-long, 30 m² hydraulic circuit, along with 6 […]
WATERPROOFING OF PEDRALBA ADIT + REQUEJO TUNNEL

The works consist of installing two layers of material (Geotextile + PVC) acting as a physical barrier between the natural ground and the structure, preventing water seepage and ensuring proper sealing, thus avoiding the adverse effects of water on the structure. A total of nearly 55,000 m2 of waterproofing.
WATERPROOFING B-40

The work consists of installing two layers of material (Geotextile + PVC) that serve as a physical barrier between the natural ground and the structure, preventing water ingress and ensuring proper sealing, thereby avoiding the negative effects of water on the structure. In total, nearly 80,000 m2 of waterproofing.
REFURBISHMENT OF THE RAMONCILLOS, GUAPA, ACEBUCHAL, AND MADROÑO TUNNELS.

Refurbishment of 4 tunnels located on the AP-7 highway (Ramoncillos, Guapa, Acebuchal, and Madroño) in the province of Granada, in compliance with Royal Decree 635/2006. The project includes drainage works, pavement, electrical installations, telecommunications, and 2 underground pedestrian evacuation galleries with a 20 m2 cross-section. The galleries are located in the Acebuchal Tunnel (67 meters) […]
UPGRADING OF THE AP-9 HIGHWAY TUNNELS

The works involve upgrading the AP-9 highway tunnels in compliance with Royal Decree 635/2006, including the construction of new emergency galleries and the installation of safety equipment and systems. All tunnels are located in an interurban environment.
NEW EMERGENCY EXITS IN THE TUNNELS OF THE VITORIA–BILBAO–SAN SEBASTIÁN HIGH-SPEED RAIL LINE. SECTION: BERGARA–ASTIGARRAGA

The works are located along the Vitoria–Bilbao–San Sebastián high-speed rail corridor. The project involves four different tunnel sections where, under new regulations, parallel emergency galleries must be integrated so that no tunnel segment exceeds 1,000 m without an emergency exit. The work is being executed with two excavation and support teams and two lining teams.
NEW EMERGENCY EXITS FOR THE TUNNELS OF THE VITORIA – BILBAO – SAN SEBASTIÁN HIGH-SPEED LINE. SECTION: VITORIA-BILBAO.

The works are located along the Vitoria–Bilbao section of the high-speed rail line. The project encompasses 7 different tunnel sections where, by regulation, parallel emergency galleries must be built to ensure that no stretch of tunnel exceeds 1,000 m without an emergency exit.
INTER-BASIN WATER TRANSFER PROJECT FOR THE PIZARROSO, ALCOLLARÍN, AND BÚRDALO RIVERS (CÁCERES)

The purpose of the inter-basin transfer project between the Pizarro, Alcollarín, and Búrdalo river basins (Cáceres) is the extension of the current transfer canal between the García de Sola and Sierra Brava dams, which reaches the Búrdalo reservoir. The nominal capacity of the projected future transfer canal is 15 m3/sec, with a total canal length […]
EL MOTO TUNGSTEN MINE

Excavation and ground support of 13,786 meters of drifts and 487 meters of shafts over a 5-year period. Three drift cross-sections are defined: main ramp (6.0×5.5), waste rock drifts (5.5×5.5), and ore access drifts (5.0×5.0). Two of the shafts will be excavated from the surface using a 3.6mØ raise boring method, totaling a length of […]