INTER-BASIN WATER TRANSFER PROJECT FOR THE PIZARROSO, ALCOLLARÍN, AND BÚRDALO RIVERS (CÁCERES)

Client:

Confederación Hidrográfica del Guadiana

The purpose of the inter-basin transfer project between the Pizarro, Alcollarín, and Búrdalo river basins (Cáceres) is the extension of the current transfer canal between the García de Sola and Sierra Brava dams, which reaches the Búrdalo reservoir. The nominal capacity of the projected future transfer canal is 15 m3/sec, with a total canal length of 36,474 m.

Along the route and in order to optimize the design, four tunnels must be built with lengths of: 1,800 m, 1,045 m, 265 m, and 1,220 m, totaling 4,330 m of tunneling, all featuring an identical lined cross-section with an internal diameter of 4.00 m. Notably, due to existing environmental constraints from being located in a ZIA zone (Area of Environmental Interest), work is prohibited in some of the tunnels for a 4-month period each year, and another tunnel must transversely cross the E-90 highway.

Technical specifications

Date:

Start:

05 - 2025

End:

02 - 2028

Country:

Spain

Province:

Cáceres

Municipality:

Zorita, Alcollarín, Abertura, and Escurial

Excavation type:

Drill and blast and mechanical excavation.

Geometry:

Cross-section:

Sec. circular de ø 4,8m

Length:

-

Overburden:

19 m

Budget:

86.668.636 €

Construction method:

New Austrian Tunneling Method, Drill and blast and mechanical excavation.

Geology and geotechnics:

Quartzites, slates, greywackes, and granites

Machinery used:

  • S-2 drilling jumbo
  • ST1030 low-profile loader
  • Shotcrete robot (PM 4210)
  • Liebherr A-904 backhoe excavator
  • Manitou 1235 aerial work platform