The Chira-Soria Pumped-Storage Hydroelectric Power Plant Project consists of an underground pumped-storage hydroelectric facility connecting two existing reservoirs located in central Gran Canaria.
The main works include:
– Construction of intake and outlet structures for the hydraulic circuit.
– Excavation, ground support, and lining of the 2 km-long, 30 m² hydraulic circuit, along with 6 vertical shafts,
including penstocks ranging from 40 m to 465 m in length and 5 m to 9 m in diameter, using raise boring and slash-down widening techniques.
– Construction of primary and secondary access tunnels, totaling 4 km in length with cross-sections of 30 m² and 50 m².
– Excavation, ground support, lining, and building construction for the powerhouse cavern, featuring a 160 m-long vault, a 200 m² cross-section, and a height of 30 m.