2_NEW EMERGENCY EXITS FOR THE TUNNELS OF THE_1

NEW EMERGENCY EXITS FOR THE TUNNELS OF THE VITORIA – BILBAO – SAN SEBASTIÁN HIGH-SPEED LINE. SECTION: VITORIA-BILBAO.

Client:

ADIF

The works are located along the Vitoria–Bilbao section of the high-speed rail line. The project encompasses 7 different tunnel sections where, by regulation, parallel emergency galleries must be built to ensure that no stretch of tunnel exceeds 1,000 m without an emergency exit.

Technical specifications

Date:

Start:

10 - 2019

End:

01 - 2022

Country:

Spain

Province:

Basque Country

Municipality:

Mondragón, Elorrio, Durango, Amorebieta, Lemoa, Galdakao and Basauri

Excavation type:

-

Geometry:

Cross-section:

28 m²

Length:

4.771 m (Galerías) + 183 m (Entronques)

Overburden:

Variable

Budget:

25.220.115 €

Construction method:

Drilling and blasting NATM System

Geology and geotechnics:

Variable

Machinery used:

  • Jumbos
  • Backhoes
  • Shotcrete robot
  • Manitou
  • Wheel loaders
  • Trucks