2_UPGRADING OF THE AP-9 HIGHWAY TUNNELS_2

UPGRADING OF THE AP-9 HIGHWAY TUNNELS

Client:

DRAGADOS - ELECTONIC TRAFIC S.A. UTE

The works involve upgrading the AP-9 highway tunnels in compliance with Royal Decree 635/2006, including the construction of new emergency galleries and the installation of safety equipment and systems. All tunnels are located in an interurban environment.

Technical specifications

Date:

Start:

03 - 2025

End:

07 - 2025

Country:

Spain

Province:

A Coruña and Pontevedra

Municipality:

Cabanas, Pontedeume, and Vigo

Excavation type:

Mechanical excavation and blasting

Geometry:

Cross-section:

17 m2 aprox.

Length:

-

Overburden:

Between 34 and 75m

Budget:

1.048.020 €

Construction method:

NATM

Geology and geotechnics:

Quartz, amphibolite, and gneiss

Machinery used:

  • 1 JCB 436 wheel loader
  • 1 2-boom hydraulic drilling jumbo
  • 1 PM4210-type concrete spraying robot
  • 1 Manitou MRT telescopic work platform
  • 1 BL61B-type backhoe loader
  • 1 Mixer truck
  • 1 20T excavator
  • 2 6T dumpers