At OSSA, we control quality at every stage of the project, from initial planning to final delivery. Our way of working is based on the principles of the ISO 9001 standard, through documented procedures, monitoring each project with our own indicators, and the continuous search for improvement opportunities. In this way, we achieve safe, efficient, and sustainable works, oriented toward offering the best result to the client.
When OSSA is awarded a project, the first thing it does is review the project documentation in search of undefined areas, omissions, or contradictions, to resolve them before they become problems on-site.
During this review, it is also verified that the project takes into account current legislation and regulations, and that it can be executed correctly with the available data.
Each project has its own Quality Plan, drafted based on ISO 9001 requirements, client requirements, and applicable regulations.
The plan establishes the organization, technical procedures, material control, and who is responsible for each phase. It is reviewed throughout execution and updated whenever the project or contract changes.
From the start of each project, a digital archive is opened, organized by areas: production, quality, safety, environment, technical office, purchasing, and administration.
Each area has a manager, all modifications are recorded, and work on-site is always carried out using the current version of each document. When the project is completed, the full archive is permanently kept at the headquarters.
Drilling and blasting, mechanical excavation, mucking, support, waterproofing, lining, and excavation control: each work unit has its own technical procedure.
It defines the materials, the execution process, the necessary resources, and the quality controls. Thus, in the most delicate phases of an underground project, nothing is left to chance.
Concrete, rock bolts, and steel are the materials that most influence the structural safety of a tunnel. Therefore, in all OSSA projects, they are identified and their full traceability is followed.
Each batch is recorded with its exact location in the project. If a non-conformity appears, it is located and corrected only where necessary, without massive interventions.
Each work unit subject to control has an Inspection Point Program that sets the approval criteria, frequency, and responsible party. Key tests in underground works (compressive strength of shotcrete and tensile testing of rock bolts) are planned, executed, and reviewed every month.
When the contract requires it, there are hold points: no activity proceeds without client approval.
Every purchase or subcontracting that could affect the quality of the work follows the same process: technical specification, bid comparison, and supplier evaluation every six months.
We choose suppliers based on their ability to meet our technical and environmental requirements, and we continue to evaluate them so that quality is maintained throughout the supply chain.
Any deviation from the project, contract, or regulations results in a Non-Conformity Report.
From there, the procedure requires informing the client of any non-conforming product or installation, obtaining their written approval when required by the contract, and applying a documented corrective action. Each incident is recorded and serves to prevent the error from being repeated.
The Quality Department at the headquarters schedules internal audits for all ongoing projects, with a minimum notice of 15 days and a subsequent report.
As this control does not depend on the project management, it allows for verification that the Management System is applied equally across all projects, regardless of the country or site conditions.
Upon closing each project, OSSA delivers the final project documentation, with all evidence that ISO 9001 and ISO 14001 requirements have been met during execution. The format is agreed upon with the client at the start of the project, so that what is generated during execution fits exactly what the client needs to receive and archive.
Quality doesn't cost. What costs is the lack of quality.
At OSSA, we see it in every project: when things are done right the first time, there are no non-conformities to correct or work to repeat. And something is gained that doesn't appear in any budget: the trust that leads our clients to choose us as a partner.
ISO 9001 certifies that OSSA's processes are designed and audited to provide predictable results that comply with requirements. In an underground project, this translates into something very specific: planning, material control, execution supervision, and non-conformity management follow documented and verifiable procedures. It doesn't matter where the project is or how complex it is.
Execution Quality
Traceability
Audited Processes