VL5 UPGRADING PHASE 2

The main activities to be carried out in the tunnel consist of installing three types of ground support (Type L1, Type L2, and Type L3) depending on the damage present, with the following characteristics: Type L1 Support (length 20 m): corresponds to a transition zone where shotcrete + welded wire mesh and spot bolts will […]

RESTORATION OF RAMA COLORADO TUNNEL AND ADIT 7

Access tunnel (adit 8) measuring 4.20 x 4.50 m in certain sections, restricted by a 2.5 m diameter water pressure plug. The repair consists of removing shotcrete from both the sidewalls and the crown, floor chipping, and the reinstatement of shotcrete + mesh + bolt and plate. Double mesh will be placed in the floor […]

METRO LINE 5 ELEVATORS

To comply with current accessibility regulations, Metro is installing elevators at all existing stations. This contract includes 26 elevators across 9 stations.

SECTION 1B OF LINE 7

Line 7 of the Santiago Metro runs between the communes of Renca and Las Condes, in the Santiago Metropolitan Region. The construction of this line consists of 6 sections; within section 1, Metro decided to create two subsections: 1B and 1C. Section 1B is approximately 2,650 m long and includes two stations (Huelén and Neptuno) […]

CONSTRUCTION OF NORTH MINE INTERIOR INFRASTRUCTURE. CONTRACT NO.: GCC-002

The Chuquicamata Underground Mine Project (PMchS), consisting of 3 underground mining levels (-1000 to -1900 m), is currently operating on the 1st level, with 92 km of horizontal development galleries remaining (52 km in the North Mine and 40 km in the South Mine), in addition to shafts and caverns. The project is part of […]