02_METRO LINE 5 ELEVATORS_1

METRO LINE 5 ELEVATORS

Client:

Metro S.A.

To comply with current accessibility regulations, Metro is installing elevators at all existing stations.

This contract includes 26 elevators across 9 stations.

Technical specifications

Date:

Start:

01 - 2018

End:

03 - 2019

Country:

Chile

Province:

Metropolitan Region

Municipality:

Santiago de Chile

Excavation type:

-

Geometry:

Cross-section:

-

Length:

-

Overburden:

-

Budget:

16.138.000 €

Construction method:

-

Geology and geotechnics:

Various

Machinery used:

  • Tower crane
  • Boom truck
  • 3.5 t truck
  • 4 Manitous