Access tunnel (adit 8) measuring 4.20 x 4.50 m in certain sections, restricted by a 2.5 m diameter water pressure plug. The repair consists of removing shotcrete from both the sidewalls and the crown, floor chipping, and the reinstatement of shotcrete + mesh + bolt and plate. Double mesh will be placed in the floor concrete. The project includes surface site facilities comprising offices, a meeting room, a changing room, mechanical and electrical workshops, showers, a dining hall, and parking and material storage areas, as well as electrical, water, communications, air, and fuel services.
