tijuana-tunnels-01

TIJUANA TUNNELS

Client:

SECRETARÍA DE LA DEFENSA NACIONAL

Execution of underground excavation, primary support using micropile umbrellas and systematic steel sets in tunnels, in accordance with the project’s geotechnical design for Tunnel 1 and Tunnel 2, with a total length of 460 m and 1,000 m, respectively.

These tunnels are located within the Tijuana Elevated Viaduct project, from Sta. 0+760 to 1+220 and from km 1+680 to 2+680.

Execution of reinforced concrete lining for Tunnel 1 and Tunnel 2.

Technical specifications

Date:

Start:

01 - 2024

End:

06 - 2025

Country:

Mexico

Province:

Baja California

Municipality:

Tijuana

Excavation type:

Conventional

Geometry:

Cross-section:

2,36m x 12,5m

Length:

460m y 1.000m

Overburden:

from 12 to 40 m

Budget:

1.654.517.325 MXN

Construction method:

Excavation in 3 heading phases and 3 benching phases.

Geology and geotechnics:

Unconsolidated coastal sedimentary deposits composed of layers of very fine sand and silt. Generally firm consistency but low cohesion.

Machinery used:

  • Caterpillar 320D excavator w/hydraulic hammer
  • Caterpillar 938K front loader
  • CAT 966 front loader
  • Atlas Copco XL3C drilling jumbo
  • Putzmeister PM500 shotcrete robot
  • Caterpillar 416D backhoe loader