Execution of underground excavation, primary support using micropile umbrellas and systematic steel sets in tunnels, in accordance with the project’s geotechnical design for Tunnel 1 and Tunnel 2, with a total length of 460 m and 1,000 m, respectively.
These tunnels are located within the Tijuana Elevated Viaduct project, from Sta. 0+760 to 1+220 and from km 1+680 to 2+680.
Execution of reinforced concrete lining for Tunnel 1 and Tunnel 2.
