DURANGUENSE TUNNEL

Cross-section enlargement of an existing 515-meter-long tunnel (expanding from a 5×5-meter cross-section to 12×8 meters). Installation of self-drilling micropiles and steel ribs at the portals. Excavation is carried out entirely using drilling and blasting, primary support with fiber-reinforced shotcrete, installation of 6-meter-long resin-grouted friction bolts, and a final layer of unreinforced shotcrete. The lining includes […]
TIJUANA TUNNELS

Execution of underground excavation, primary support using micropile umbrellas and systematic steel sets in tunnels, in accordance with the project’s geotechnical design for Tunnel 1 and Tunnel 2, with a total length of 460 m and 1,000 m, respectively. These tunnels are located within the Tijuana Elevated Viaduct project, from Sta. 0+760 to 1+220 and […]
B3 TROJENA TUNNEL

As part of the construction of the residential complex, hotels, and resorts being built in Trojena, located in a mountainous area of the Tabuk / NEOM province, access infrastructure is required; our project consists of a 680-meter road tunnel to provide access to this tourist destination.
REFURBISHMENT OF THE RAMONCILLOS, GUAPA, ACEBUCHAL, AND MADROÑO TUNNELS.

Refurbishment of 4 tunnels located on the AP-7 highway (Ramoncillos, Guapa, Acebuchal, and Madroño) in the province of Granada, in compliance with Royal Decree 635/2006. The project includes drainage works, pavement, electrical installations, telecommunications, and 2 underground pedestrian evacuation galleries with a 20 m2 cross-section. The galleries are located in the Acebuchal Tunnel (67 meters) […]
UPGRADING OF THE AP-9 HIGHWAY TUNNELS

The works involve upgrading the AP-9 highway tunnels in compliance with Royal Decree 635/2006, including the construction of new emergency galleries and the installation of safety equipment and systems. All tunnels are located in an interurban environment.