BEKKELAGET TREATMENT PLANT EXPANSION

The expansion of the Bekkelaget water treatment plant in Norway allowed for doubling its treatment capacity, from 4 m³/s to 8 m³/s, and increasing its service capacity from 290,000 to 500,000 population equivalents. Considered Norway’s largest environmental project, the project required the underground excavation of more than 445,000 m³ of rock using drilling and blasting, […]
MINERA PANAMÁ TUNNEL

FIRST QUANTUM MINERALS 1,200 m tunnel for tailings management in mining operations. Section 4.5 x 5.7 m. Includes slab and 1.2 m high walls reinforced with 20 cm thick mesh. Includes 279 m adit.
INTAKE AND OUTFALL SHAFTS WITHIN THE “SEAWATER DESALINATION PLANT PROJECT FOR THE ATACAMA REGION, COPIAPÓ AND CHAÑARAL”

Execution of the Intake and Outfall Shafts using drilling and blasting, lined with shotcrete. The shaft collars were executed by the previous contractor, as was the installation of one of the beams in the intake shaft. The installation of bolts is also included as part of the ground support, along with 3 steel sets in […]
INTER-BASIN WATER TRANSFER PROJECT FOR THE PIZARROSO, ALCOLLARÍN, AND BÚRDALO RIVERS (CÁCERES)

The purpose of the inter-basin transfer project between the Pizarro, Alcollarín, and Búrdalo river basins (Cáceres) is the extension of the current transfer canal between the García de Sola and Sierra Brava dams, which reaches the Búrdalo reservoir. The nominal capacity of the projected future transfer canal is 15 m3/sec, with a total canal length […]