The expansion of the Bekkelaget water treatment plant in Norway allowed for doubling its treatment capacity, from 4 m³/s to 8 m³/s, and increasing its service capacity from 290,000 to 500,000 population equivalents.

Considered Norway’s largest environmental project, the project required the underground excavation of more than 445,000 m³ of rock using drilling and blasting, as well as the execution of support, reinforcement, and structural construction work throughout the expansion. The contract also included the demolition and removal of concrete structures and tanks from the existing plant.

Entre las actuaciones más destacadas se encuentra la construcción de cinco cavernas subterráneas, con secciones de entre 300 y 425 m² y longitudes de hasta 180 metros, además de túneles de acceso y evacuación, pozos, digestores y tanques de almacenamiento y tratamiento, con una longitud total aproximada de 2 kilómetros.

Technical specifications

Date:

Start:

08 - 2014

End:

05 - 2017

Country:

Norway

Province:

Oslo

Municipality:

Oslo

Excavation type:

Hydraulic tunnel and caverns

Geometry:

Cross-section:

Túnel 90 m2. Cavernas entre 300 – 425 m2

Length:

Túnel 2.000 m. 5 Cavernas de 180 m.

Overburden:

Low

Budget:

446.694.021 NOK.

Construction method:

NATM. Drill and blast and mechanical methods

Geology and geotechnics:

Gneiss

Machinery used:

  • Three-boom drill jumbo
  • Shotcrete robot
  • Backhoe excavator
  • Telehandler