VL5 UPGRADING PHASE 2

The main activities to be carried out in the tunnel consist of installing three types of ground support (Type L1, Type L2, and Type L3) depending on the damage present, with the following characteristics: Type L1 Support (length 20 m): corresponds to a transition zone where shotcrete + welded wire mesh and spot bolts will […]
RESTORATION OF RAMA COLORADO TUNNEL AND ADIT 7

Access tunnel (adit 8) measuring 4.20 x 4.50 m in certain sections, restricted by a 2.5 m diameter water pressure plug. The repair consists of removing shotcrete from both the sidewalls and the crown, floor chipping, and the reinstatement of shotcrete + mesh + bolt and plate. Double mesh will be placed in the floor […]
CHIRA-SORIA PUMPED-STORAGE HYDROELECTRIC POWER PLANT

The Chira-Soria Pumped-Storage Hydroelectric Power Plant Project consists of an underground pumped-storage hydroelectric facility connecting two existing reservoirs located in central Gran Canaria. The main works include: – Construction of intake and outlet structures for the hydraulic circuit. – Excavation, ground support, and lining of the 2 km-long, 30 m² hydraulic circuit, along with 6 […]