The Minister of Housing, Transportation, and Infrastructure of the Community of Madrid, Jorge Rodrigo, accompanied by Miguel Núñez, Director General of Public Transportation Infrastructure, visited the expansion works of Madrid Metro Line 3 today, between the Villaverde Alto and El Casar work fronts, which OSSA is executing alongside Grupo Azvi and COTODISA Obras y Servicios.
Currently, the 2.6 km of tunnel have already been excavated, and work is underway on track assembly and finishing. This new metro section will connect the eastern arc of Metrosur with the rest of the metro network quickly and efficiently; the new El Casar station will have a direct connection to L12 and C-3, as well as a park-and-ride facility to link with other modes of transportation.