OSSA is currently executing the civil works for Station E4-05 “El Olivar,” on the L4 branch line of the Lima Metro. This is the fifth station OSSA is building for the Consorcio Constructor M2 Lima, in addition to the 4 km of tunnels and shafts previously executed.
The works comprise the excavation between diaphragm walls and the construction of the station’s various levels—roof, concourse, and platforms—as well as the primary, secondary, and masonry concrete structures that make up the infrastructure.