DURANGUENSE TUNNEL

Cross-section enlargement of an existing 515-meter-long tunnel (expanding from a 5×5-meter cross-section to 12×8 meters). Installation of self-drilling micropiles and steel ribs at the portals. Excavation is carried out entirely using drilling and blasting, primary support with fiber-reinforced shotcrete, installation of 6-meter-long resin-grouted friction bolts, and a final layer of unreinforced shotcrete. The lining includes […]

TIJUANA TUNNELS

Execution of underground excavation, primary support using micropile umbrellas and systematic steel sets in tunnels, in accordance with the project’s geotechnical design for Tunnel 1 and Tunnel 2, with a total length of 460 m and 1,000 m, respectively. These tunnels are located within the Tijuana Elevated Viaduct project, from Sta. 0+760 to 1+220 and […]

N-1414 PUMPING STATION

Development of mining works, rock support, and material handling for the construction of a Pumping Station