SECTION 1B OF LINE 7

Line 7 of the Santiago Metro runs between the communes of Renca and Las Condes, in the Santiago Metropolitan Region. The construction of this line consists of 6 sections; within section 1, Metro decided to create two subsections: 1B and 1C. Section 1B is approximately 2,650 m long and includes two stations (Huelén and Neptuno) […]
EXECUTION OF CIVIL WORKS FOR TUNNEL BACKFILLING – SECTION E-04 “INSURGENTES” – E-11 “PARQUE MURILLO” LINE 2 AND LINE 4

Pouring of 177,782.72 m³ of concrete across sections within stations and tunnels on Lines 2 and 4 of the Lima Metro, including the installation of drainage pipes, electrical conduits, manholes, and ballast mats. Additionally, segments and two-component grout are removed at each station following the passage of the TBM.
EXECUTION OF CIVIL WORKS FOR THE E4-07 “MORALES DUAREZ” STATION, L4 BRANCH LINE

The works include the excavation of the station box totaling 74,000 m³, and the construction of reinforced concrete slabs at the roof, concourse, foundation, and platform levels totaling 13,720 m³. Secondary structures such as stairs, elevators, and reinforced concrete walls complete the project’s scope. Architectural and finishing works include block walls, drywall, plastering, flooring, and […]