The works include the excavation of the station box totaling 74,000 m³, and the construction of reinforced concrete slabs at the roof, concourse, foundation, and platform levels totaling 13,720 m³.
Secondary structures such as stairs, elevators, and reinforced concrete walls complete the project’s scope. Architectural and finishing works include block walls, drywall, plastering, flooring, and painting.