EL-MOTO-TUNGSTEN-MINE_01

EL MOTO TUNGSTEN MINE

Client:

ABENOJAR TUNGSTEN, S.A.

Excavation and ground support of 13,786 meters of drifts and 487 meters of shafts over a 5-year period. Three drift cross-sections are defined: main ramp (6.0×5.5), waste rock drifts (5.5×5.5), and ore access drifts (5.0×5.0). Two of the shafts will be excavated from the surface using a 3.6mØ raise boring method, totaling a length of 148 m. The remaining shafts will feature a 3.0×3.0-meter section and will be developed between underground levels using suspended blast charges. Ground support for drifts and shafts will consist of shotcrete, rock bolts, wire mesh, and steel sets.

Technical specifications

Date:

Start:

07 - 2026

End:

06 - 2031

Country:

Spain

Province:

Ciudad Real

Municipality:

Abenójar

Excavation type:

Drilling and Blasting

Geometry:

Cross-section:

Rampa de 33 m² al 14% y Galerías de Sección variable (25 a 30 m²)

Length:

-

Overburden:

400 meters

Budget:

52.439.747 €

Construction method:

Drilling and Blasting

Geology and geotechnics:

-

Machinery used:

  • 2 drifting and bolting jumbos
  • 2 LHD loaders
  • 1 Roboshot
  • 2 telehandlers
  • 3 articulated dump trucks
  • 1 backhoe with hydraulic breaker