CONSTRUCTION OF NORTH MINE INTERIOR INFRASTRUCTURE. CONTRACT NO.: GCC-002

The Chuquicamata Underground Mine Project (PMchS), consisting of 3 underground mining levels (-1000 to -1900 m), is currently operating on the 1st level, with 92 km of horizontal development galleries remaining (52 km in the North Mine and 40 km in the South Mine), in addition to shafts and caverns. The project is part of […]
EL MOTO TUNGSTEN MINE

Excavation and ground support of 13,786 meters of drifts and 487 meters of shafts over a 5-year period. Three drift cross-sections are defined: main ramp (6.0×5.5), waste rock drifts (5.5×5.5), and ore access drifts (5.0×5.0). Two of the shafts will be excavated from the surface using a 3.6mØ raise boring method, totaling a length of […]
N-1414 PUMPING STATION

Development of mining works, rock support, and material handling for the construction of a Pumping Station