EXECUTION OF CIVIL WORKS FOR TUNNEL BACKFILLING - SECTION E-04 "INSURGENTES" - E-11 "PARQUE MURILLO" LINE 2 AND LINE 4_4

EXECUTION OF CIVIL WORKS FOR TUNNEL BACKFILLING – SECTION E-04 “INSURGENTES” – E-11 “PARQUE MURILLO” LINE 2 AND LINE 4

Client:

CONSORCIO CONSTRUTOR M2 LIMA


Pouring of 177,782.72 m³ of concrete across sections within stations and tunnels on Lines 2 and 4 of the Lima Metro, including the installation of drainage pipes, electrical conduits, manholes, and ballast mats. Additionally, segments and two-component grout are removed at each station following the passage of the TBM.

Technical specifications

Date:

Start:

08 - 2025

End:

08 - 2027

Country:

Peru

Province:

Callao

Municipality:

Callao

Excavation type:

-

Geometry:

Cross-section:

177,782.72 m³ concreto en masa.

Length:

-

Overburden:

-

Budget:

7.214.090 USD

Construction method:

Massive concrete pouring in tunnel section.

Geology and geotechnics:

-

Machinery used:

  • Stationary pumps
  • Boom pumps
  • 120-ton mobile crane
  • Front loader
  • Backhoe