01_CHIRA-SORIA PUMPED-STORAGE HYDROELECTRIC POWER PLANT_5

CHIRA-SORIA PUMPED-STORAGE HYDROELECTRIC POWER PLANT

Client:

REE

The Chira-Soria Pumped-Storage Hydroelectric Power Plant Project consists of an underground pumped-storage hydroelectric facility connecting two existing reservoirs located in central Gran Canaria.

The main works include:

– Construction of intake and outlet structures for the hydraulic circuit.

– Excavation, ground support, and lining of the 2 km-long, 30 m² hydraulic circuit, along with 6 vertical shafts,

including penstocks ranging from 40 m to 465 m in length and 5 m to 9 m in diameter, using raise boring and slash-down widening techniques.

– Construction of primary and secondary access tunnels, totaling 4 km in length with cross-sections of 30 m² and 50 m².

– Excavation, ground support, lining, and building construction for the powerhouse cavern, featuring a 160 m-long vault, a 200 m² cross-section, and a height of 30 m.

Technical specifications

Date:

Start:

01 - 2023

End:

07 - 2027

Country:

Spain

Province:

Las Palmas de Gran Canaria

Municipality:

San Bartolomé de Tirajana, Mogán, and Tejeda.

Excavation type:

Galleries, shafts, and caverns

Geometry:

Cross-section:

-

Length:

-

Overburden:

Variable.

Budget:

254 MM. €

Construction method:

Drill and blast. (NATM)

Geology and geotechnics:

Slightly weathered ignimbrite rock, with high strength.

Machinery used:

  • PUTZMEISTER PM-500 robot
  • EPIROC L2C jumbos
  • Backhoe with hammer.
  • EPIROC ST-14 loader
  • VOLVO A25 articulated dump trucks
  • NORMET scissor lifts
  • Formwork travelers.