03_INTAKE AND OUTFALL SHAFTS WITHIN DESALINATION PLANT PROJECT_1

INTAKE AND OUTFALL SHAFTS WITHIN THE “SEAWATER DESALINATION PLANT PROJECT FOR THE ATACAMA REGION, COPIAPÓ AND CHAÑARAL”

Client:

UTE Inima-CVV S.A.


Execution of the Intake and Outfall Shafts using drilling and blasting, lined with shotcrete. The shaft collars were executed by the previous contractor, as was the installation of one of the beams in the intake shaft. The installation of bolts is also included as part of the ground support, along with 3 steel sets in the first meters of excavation.

Technical specifications

Date:

Start:

07 - 2018

End:

10 - 2018

Country:

Chile

Province:

Atacama - Region III

Municipality:

Caldera

Excavation type:

Drill and blast

Geometry:

Cross-section:

H=23 m / 23 m de diámetro

Length:

H=27 m / 14 m de diámetro

Overburden:

-

Budget:

69.000 UF

Construction method:

Drill and blast

Geology and geotechnics:

-

Machinery used:

  • Drill jumbo
  • Mucking crane