WATERPROOFING OF PEDRALBA ADIT + REQUEJO TUNNEL

The works consist of installing two layers of material (Geotextile + PVC) acting as a physical barrier between the natural ground and the structure, preventing water seepage and ensuring proper sealing, thus avoiding the adverse effects of water on the structure. A total of nearly 55,000 m2 of waterproofing.
METRO LINE 5 ELEVATORS

To comply with current accessibility regulations, Metro is installing elevators at all existing stations. This contract includes 26 elevators across 9 stations.
WATERPROOFING B-40

The work consists of installing two layers of material (Geotextile + PVC) that serve as a physical barrier between the natural ground and the structure, preventing water ingress and ensuring proper sealing, thereby avoiding the negative effects of water on the structure. In total, nearly 80,000 m2 of waterproofing.