Commissioning of the Madrid Metro Line 3 extension (Spain)

We are pleased to share with all of you that the Ministry for the Ecological Transition and the
Carbon Footprint Calculation (Spain)
We are pleased to share with you all that the Ministry for the Ecological Transition and the
Women bEYond Event (Spain)

This March, FORBES Spain and EY Spain organized the Women bEYond event to
OSSA’s New Image

OSSA looks to the future and renews its brand image. At OSSA, we have always been
First Session of OSSA Project Insights (Spain)

On March 6, 2025, the first session was held with great success
Completion of the Llano Crucero to San Juan Lachixila section of the Mitla – Tehuantepec highway (Mexico)

The Secretariat of Infrastructure, Communications and Transportation of the Government of Mexico has completed the section
OSSA Collaborates with Fondacio (Chile)

As it does every year, OSSA collaborates with Fondacio Chile, a foundation dedicated to bringing joy to children
Salto de Chira hydroelectric power plant in the press (Spain)

OSSA is carrying out the civil works for the E4-05 “El Olivar” Station, on the L4 branch of the Lima Metro.
Construction Works on the “El Olivar” Station in Lima (Peru)

OSSA is currently executing the civil works for Station E4-05 “El Olivar,” on the L4 branch line of the Lima Metro.
Visit of the Community of Madrid’s Minister of Housing to the Line 3 Construction Site (Spain)

The Minister of Housing, Transportation, and Infrastructure of the Community of Madrid