Refurbishment of 4 tunnels located on the AP-7 highway (Ramoncillos, Guapa, Acebuchal, and Madroño) in the province of Granada, in compliance with Royal Decree 635/2006. The project includes drainage works, pavement, electrical installations, telecommunications, and 2 underground pedestrian evacuation galleries with a 20 m2 cross-section. The galleries are located in the Acebuchal Tunnel (67 meters) and the Madroño Tunnel (115 m), connecting the main tunnel bores.
