3_OINDOLAR TUNNEL REPAIR_2

B3 TROJENA TUNNEL

Client:

SMC

As part of the construction of the residential complex, hotels, and resorts being built in Trojena, located in a mountainous area of the Tabuk / NEOM province, access infrastructure is required; our project consists of a 680-meter road tunnel to provide access to this tourist destination.

Technical specifications

Date:

Start:

08 - 2024

End:

08 - 2025

Country:

Saudi Arabia

Province:

Tabuk / NEOM

Municipality:

-

Excavation type:

Drill and blast

Geometry:

Cross-section:

140 m2 Arco Herradura

Length:

680m

Overburden:

Variable

Budget:

31.520.342,25 SAR

Construction method:

NATM

Geology and geotechnics:

-

Machinery used:

  • Jumbos XL3C and E2C
  • Robot PM 500
  • Normet
  • Manitou