Visit to the Madrid Metro Line 3 Extension Works


The President of the Community of Madrid, Isabel Díaz Ayuso; the Deputy Minister of Transport of the Community of Madrid, Carlos Díaz-Pache; the Mayor of Getafe, Sara Hernández; and the CEO of Metro, Silvia Roldán, visited the extension works of Madrid Metro Line 3, S.A., from El Casar station (Getafe) to Villaverde Alto (Madrid), which OSSA is executing in a consortium with Grupo Azvi and COTODISA OBRAS Y SERVICIOS.

The works, which began in February 2022 and have a 22-month execution period, consist of the construction of a 2,645 m tunnel excavated using the traditional Madrid method (2,135 m) and diaphragm walls (515 m). This extension will connect the eastern arc of Metrosur with the rest of the metro network quickly and efficiently, allowing passengers to reach Puerta del Sol in just 30 minutes. The new El Casar station will have a direct connection to L12 and C-3 and will feature a park-and-ride facility to enable connections with other modes of transport.

Back to news