On February 3, the breakthrough of Tunnel 2 on the Mitla-Tehuantepec highway was achieved. This project is being carried out by OSSA for Operadora CICSA S.A. de C.V. in the state of Oaxaca, Mexico. The tunnel was excavated using heading and benching, with a length of 100 meters and a horseshoe cross-section measuring 14.8 x 9.44 m.
Congratulations to the entire team!