DEVELOPMENT OF RAMPS AND ADDITIONAL HORIZONTAL WORKS (SUMPS, CROSSCUTS, ORE FACES...)_1

CONSTRUCTION OF NORTH MINE INTERIOR INFRASTRUCTURE. CONTRACT NO.: GCC-002

Client:

Codelco


The Chuquicamata Underground Mine Project (PMchS), consisting of 3 underground mining levels (-1000 to -1900 m), is currently operating on the 1st level, with 92 km of horizontal development galleries remaining (52 km in the North Mine and 40 km in the South Mine), in addition to shafts and caverns. The project is part of the mining continuity works for MBs N42, N51, and N52, along with auxiliary galleries, intended to provide access for the completion of LEVEL 1 in macroblocks N05-N06-N52 (North MBs) and S05-S06 (South MBs). OSSA will execute this continuity across the Undercut, Production, Injection-Extraction, and Haulage levels. The main activities include the excavation and ground support of horizontal developments, with the following scope: (MIN) 6,338 m of Horizontal Development, (CIVIL) 41 Walls, 37 PEX, 1,320 m2 of Pavement, 18 Intersections, (MECH/ELEC) 16 Fans, 1 Electrical Room, 1 Electrical Enclosure, 1 Extra-light Door, 4 Ventilation Doors, and 5,000 m of Piping.

Technical specifications

Date:

Start:

01 - 2025

End:

05 - 2026

Country:

Chile

Province:

Antofagasta Region

Municipality:

Calama (2,260 AMSL)

Excavation type:

Mining galleries and shafts

Geometry:

Cross-section:

Galerías de Sección variable ( 18,5 a 39 m2)

Length:

-

Overburden:

Over 1,050 meters

Budget:

89.166.613.971 $

Construction method:

Drilling and Blasting

Geology and geotechnics:

Amphibolites and Granodiorites

Machinery used:

  • 6 Boomer S2C 2-boom jumbos
  • 8 Mucking units (Scoop ST-18, 14, 1020 + MT 65 and 60 Dumpers)
  • 15 Manitou support units
  • 5 Support units (Normet – Putzmeister Robots)
  • 4 Scaling excavators