One of the technical challenges of the Route 60 tunnel, which OSSA is constructing in Israel in a joint venture with the company Oron, is the minimal clearance between this new tunnel and the existing one (approximately 3 m). This means that the widenings of the existing tunnel are intercepted by the construction of the new tunnel. Last week, the first connection between the two tunnels occurred when the South bay of the existing tunnel was reached.