Yesterday, the Community of Madrid put into service the extension of Madrid Metro Line 3 from El Casar station in Getafe to Villaverde Alto, the first expansion of the network in the last decade. The works required 2,000 workers and involved the drilling of a 2,600-meter tunnel, combining the traditional pick-and-shovel model with the sequential excavation method, used for the first time in the region.
OSSA has had the honor of executing this project, together with Grupo Azvi and COTODISA Obras y Servicios, which provides MetroSur (L12) with a second link to the capital, also directly benefiting the residents of Alcorcón, Fuenlabrada, Leganés, and Móstoles.
https://www.youtube.com/embed/914el1c1alQ?si=X9wTLxSqXviCCfaZ