Last week marked the breakthrough of the Trojena B3 Tunnel, which OSSA is executing as a subcontractor for Source Machinery and Webuild. This is a 680-meter-long tunnel located on the north shore of Trojena Lake, connecting the Lake Access Road to The Vault. More than 90,000 m³ of material were excavated for this project, utilizing 58.5 tons of explosives across more than 130 blasts.
OSSA continues to expand its footprint in Saudi Arabia, particularly within the NEOM gigaproject.