{"id":3340,"date":"2022-11-22T06:58:00","date_gmt":"2022-11-22T05:58:00","guid":{"rendered":"http:\/\/ossaint.com\/visit-to-the-extension-works-of-line-3-of-metro-de-madrid-s-a\/"},"modified":"2023-02-19T13:05:12","modified_gmt":"2023-02-19T12:05:12","slug":"visit-to-the-extension-works-of-line-3-of-metro-de-madrid-s-a","status":"publish","type":"post","link":"https:\/\/ossaint.com\/en\/visit-to-the-extension-works-of-line-3-of-metro-de-madrid-s-a\/","title":{"rendered":"Visit to the extension works of Line 3 of Metro de Madrid, S.A."},"content":{"rendered":"\n<p>The President of the Community of Madrid, Isabel D\u00edaz Ayuso, the Deputy Minister of Transport of the Community of Madrid, Carlos D\u00edaz-Pache, the Mayor of Getafe, Sara Hern\u00e1ndez, and the CEO of Metro, Silvia Rold\u00e1n, visited the extension works of Line 3 of Metro de Madrid, S.A., from El Casar station (Getafe) to Villaverde Alto (Madrid), that OSSA is running in consortium with Grupo Azvi y COTODISA OBRAS Y SERVICIOS.<\/p>\n\n<p>The works, which began in February 2022 and have an execution period of 22 months, consisting of the construction of a 2,645m tunnel excavated using the traditional Madrid method (2,135m) and using screens (515m). This extension will connect the eastern arc of Metrosur with the rest of the metro network in a fast and efficient way allowing you to disembark directly at the Puerta del Sol in just 30 minutes. El Casar station will have a direct connection with L12, C3 and will have a deterrent parking which will allow connection with other modes of transport.<\/p>\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"500\" height=\"340\" src=\"http:\/\/ossaint.local\/wp-content\/uploads\/2022\/11\/1669201749370-1-500x340.jpg\" alt=\"\" class=\"wp-image-2526\" srcset=\"https:\/\/ossaint.com\/wp-content\/uploads\/2022\/11\/1669201749370-1-500x340.jpg 500w, https:\/\/ossaint.com\/wp-content\/uploads\/2022\/11\/1669201749370-1-150x102.jpg 150w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The President of the Community of Madrid, Isabel D\u00edaz Ayuso, the Deputy Minister of Transport of the Community of Madrid, Carlos D\u00edaz-Pache, the Mayor of Getafe, Sara Hern\u00e1ndez, and the CEO of Metro, Silvia Rold\u00e1n, visited the extension works of Line 3 of Metro de Madrid, S.A., from El Casar station (Getafe) to Villaverde Alto [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3164,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[42,1],"tags":[],"class_list":["post-3340","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-sin-categorizar"],"_links":{"self":[{"href":"https:\/\/ossaint.com\/en\/wp-json\/wp\/v2\/posts\/3340"}],"collection":[{"href":"https:\/\/ossaint.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ossaint.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ossaint.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ossaint.com\/en\/wp-json\/wp\/v2\/comments?post=3340"}],"version-history":[{"count":1,"href":"https:\/\/ossaint.com\/en\/wp-json\/wp\/v2\/posts\/3340\/revisions"}],"predecessor-version":[{"id":3651,"href":"https:\/\/ossaint.com\/en\/wp-json\/wp\/v2\/posts\/3340\/revisions\/3651"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ossaint.com\/en\/wp-json\/wp\/v2\/media\/3164"}],"wp:attachment":[{"href":"https:\/\/ossaint.com\/en\/wp-json\/wp\/v2\/media?parent=3340"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ossaint.com\/en\/wp-json\/wp\/v2\/categories?post=3340"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ossaint.com\/en\/wp-json\/wp\/v2\/tags?post=3340"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}