Secondary lining of conventional tunnel. Package 01, Phase 1a, connecting colectora industrial station and shaft PV 19 bis. Line 2 and branch tunnel Av. Faucett – Av. Gambetta of the Lima and Callao Basic Metro Network
BUSINESS AREA:  Construction
PROJECT TYPE:  Subway tunnels
START DATE:  10 / 2016
END DATE:  In process
CLIENT:  Consorcio Constructor M2 Lima (DRAGADOS-FCC-COSAPI-ANSALDO-IMPREGILO)
LOCATION:  Lima (Perú)
LENGTH:  2.240 m.
SECTION:  68 m²