Hydraulic tunnel for the Renace IV Hydropower Project
BUSINESS AREA:  Energy
PROJECT TYPE:  Hydroelectric tunnels
START DATE:  09 / 2016
END DATE:  In process
CLIENT:  COBRA
LOCATION:  Central Guatemala, on the left bank of the Canlich River
LENGTH:  3.401 m.
SECTION:  3,5 x 4,2 m.16 m²