El Almendral Tunnel. Construction of Mediterranean High Speed Corridor. Murcia–Almería section. Barranco de Gafarillos–Los Arejos subsection
BUSINESS AREA:  Construction
PROJECT TYPE:  Railway tunnels
START DATE:  03 / 2010
END DATE:  06 / 2011
CLIENT:  U.T.E. Gafarillos
LOCATION:  Almería (Spain)
LENGTH:  1.106,00 m.
SECTION:  130 m²