Conduction Tunnel I on the C.H. Renace II Construction Project
BUSINESS AREA:  Energy
PROJECT TYPE:  Hydroelectric tunnels
START DATE:  07 / 2013
END DATE:  02 / 2014
CLIENT:  Cobra
LOCATION:  Departamento de Alta Verapaz (Guatemala)
LENGTH:  Adit 330 m. Túnel 2.500 m.
SECTION:  Adit 6,70 x 6,70 túnel 6,10 x 6,10